2022 · Axis Lighting
Shop Drawing Validation Program
Quality · Process Design
Governed a dedicated validation team, verification tools, and SOPs to catch shop-drawing defects before they reached production.
Post-production issues
79%→7%
Artifacts
Selected outputs from the project — videos, generated drawings, code, and stakeholder decks.
Problem
79% of orders surfaced post-production drawing issues — rework, scrap, and customer escalations were the norm.
Approach
- Recruited and trained a cross-functional validation team
- Built verification tools that compared generated drawings against the configured BOM
- Wrote SOPs codifying what 'production-ready' means for every product family
- Instrumented Jira ticket flow so misses became feedback into PRJ-02
Outcome
A repeatable quality gate that turned drawing validation from heroic firefighting into a measured, sub-10% exception process.