// experience

Five years. Two continents. One thread.

  1. 2024

    Oct 2024 — Apr 2026 · Canada

    WITH WORK COLLEAGUES AT THE AXIS LIGHTING HEAD OFFICE

    Product Automation Specialist

    Axis Lighting

    // achievements

    • Automated CAD generation for 83 products using DriveWorks and SolidWorks — reduced shop drawing generation time from 1.3h → 6 min per order line
    • Cut data-related non-conformances 24.6% → 9.1% with a centralized Excel calculation tool for complex pattern fixtures
    • Reduced complex-fixture client submittal lead time 7.5d → 5d via fixture data consolidation in SolidWorks PDM
    • Developed an Excel tool for calculating driver currents and board forward voltage for PCBs connected in series and parallel combinations
    • Single-handedly resolved 2,387 Jira tickets covering CAD, data, and logic errors

    // responsibilities

    • Collect, organize, and maintain technical data across lighting fixtures — product configurators, CAD models, data cards, test results, Epicor and automation data
    • Prepare reports, presentations, and documentation communicating findings and recommendations to R&D, Engineering, Manufacturing, and Management
    • Build and automate data and CAD workflows using Excel, Epicor, SolidWorks, and DriveWorks — and evaluate new tooling to strengthen data management
    • Perform CAD and automation data testing for new product releases prior to production deployment
    • Partner with IT, Engineering, and Production to support sales orders, debug configurator and code logic, and drive non-conformances down
    • Act as the frontline in Jira Service Management — analyzing, dispatching, processing, and releasing Product Automation tickets
  2. 2024

    Jul 2024 — Sep 2024 · Canada

    PRESENTING THE BUSINESS IMPACT OF ENGINEERING DATA INITIATIVE TO THE OWNER, CEO, DIRECTORS, AND SENIOR LEADERSHIP

    Manufacturing Project Manager

    Axis Lighting

    // achievements

    • Implemented a FIFO process through structured LOT tracking — improving material flow, utilization, and traceability
    • Power BI dashboard for production efficiency and throughput KPIs cut manual reporting from 8h to 30 min

    // responsibilities

    • Shape the strategic project portfolio for production and its support teams
    • Develop and deploy the Initiative Intake Form with the departmental manager and project sponsor after ideation
    • Identify key stakeholders with a RACI chart alongside other required project assets
    • Set up the project SharePoint and write the project charter once the initiative is approved
    • Develop the project plan — timeline in Jira, budget, and resource requirements — with the sponsor and SMEs
    • Manage project dependencies, bottlenecks, and constraints, and adjust resource allocations as needed
    • Keep communication effective through one-on-ones with sponsors, progress meetings with SMEs, and status reports
    • Run project closure — documentation, stakeholder acceptance, knowledge transfer, and handover to operations — and capture lessons learned
  3. 2022

    OCT 2022 — JUN 2024 · CANADA

    CLOSING OUT THE ENGINEERING DATA PROJECT WITH THE PROJECT SPONSOR AND CROSS-FUNCTIONAL TEAM

    Manufacturing Project Coordinator

    Axis Lighting

    // achievements

    • Architected SQL + C# engineering data pipeline — non-conformances 29.5% → 5.1% in 18 months
    • Governed Shop Drawing Validation program — post-production issues 79% → 7%
    • Replaced 49 Excel files + 2 legacy apps with one Excel tool — non-conformities 7.3% → 2.7%
    • Led PCB depletion via rule-based ERP & automation logic — obsolete inventory CAD 872K → CAD 481K in 12 months

    // responsibilities

    • Review shop drawings, BOMs, and technical documentation to ensure accurate material and information flow to the production floor
    • Conduct process and flow kaizens and execute lean projects that cut waste and move the shop toward one-piece flow
    • Lead projects that automate manufacturing systems using VBA, Python, DriveWorks, APS and Epicor portals
    • Train production resources on new processes and new technology
  4. 2021

    Jan 2021 — Apr 2022 · Hamilton, Canada

    THE IRON RING — JOHN HODGINS ENGINEERING BUILDING, MCMASTER UNIVERSITY

    M.Eng, Manufacturing Engineering

    McMaster University

    // highlights

    • Full-time graduate program bridging site engineering in Qatar and manufacturing automation in Canada.
    • Coursework: Lean Six Sigma for Engineers, Practical Project Management, Manufacturing Systems, Electric Drive Vehicles

    // projects

    • Plug-In Hybrid Electric Vehicle Design — designed a plug-in hybrid on a P2 powertrain architecture, evaluated Level 0 and Level 2 autonomy integration, and ran a market-based cost analysis of how autonomous features affect feasibility and vehicle design
    • Drum Gear Shift Manufacturing Optimisation — analysed dimensional variation in drum gear shift body diameters at a Honda manufacturing plant, lifting process capability from 3.3σ to 4.6σ with projected savings of ~$668K per million units produced
  5. 2020

    APR 2020 — MAR 2021 · Qatar

    RECOGNITION AWARD FOR SECURING THE £4.3M TOTALENERGIES ESP SUPPLY & COMMISSIONING CONTRACT

    Assistant Project Engineer

    Doha Engineering Services Company

    // achievements

    • Secured £4.3M TotalEnergies ESP supply & commissioning contract via SAP Ariba documentation
    • Secured QAR 1.5M Dolphin Energy heat-exchanger contract through technical + commercial docs

    // responsibilities

    • Review customer requirements against the Timken database and issue parts for warehouse release
    • Prepare cost-benefit analyses for ongoing projects
    • Perform portable appliance testing (PAT) activities at client locations
    • Perform infrared thermography inspections with the Fluke Ti480 PRO infrared camera
    • Perform wireless temperature monitoring using the Delta T Alert system by IRISS Inc.
    • Prepare company presentations for customers on the overall benefits of different services provided
  6. 2020

    Feb 2020 — Apr 2020 · Qatar

    PRE-SHIFT BRIEFING WITH THE FIT-OUT TEAM ON THE QATAR ENERGY HQ FLOOR

    Site Engineer

    Al Kaabi Contracting & Trading Company

    // achievements

    • Delivered five floors of Qatar Energy HQ fit-out in three months through efficient labor, material, and schedule supervision.

    // responsibilities

    • Lead a 60-member crew for installing demountable partitions across Qatar Energy HQ
    • Run daily briefings and coordinate site work sequence with the main contractor
    • Execute laser layout marking based on architectural drawings to hold installation tolerances on site
    • Inspect incoming materials and issue work authorization permits
  7. 2019

    May 2019 — Jun 2019 · Qatar

    PERFORMING 4-AXIS CNC MACHINING ALONGSIDE A CNC OPERATOR

    Intern

    Delta Corporation

    // LEARNING

    • Reviewed 2D X-MAS Tree drawings for wellhead assemblies
    • Performed slip ring load calculations for a Qatar Energy wellhead
    • Machined mid-section of a wellhead on a 4-axis CNC